Washingtonville Central School District voters overwhelmingly approved a $43.4 million capital project in May 2024. Informed through the completion of the district’s state-mandated Building Condition Survey in 2023, the proposed project prioritizes health and safety, infrastructure, and athletic improvements to maintain, update, and enhance our existing school facilities. 

Information on the proposed scope of work, total cost, and estimated tax impact can be found below. We encourage community members to attend upcoming Board of Education meetings or contact the district office with any questions. 

The capital project is maintaining, updating and enhancing facilities at all five school buildings, including infrastructure, health and safety needs, kitchen equipment, new turf fields, track, and other field improvements. It will also make district-wide pool and playground improvements. 

Washingtonville Capital Project

Planned Improvements - High School

Athletics

  • Improve drainage and access driveway at
    upper athletic fields
  • Provide new multi-purpose synthetic turf
    athletic field and track
  • Upgrade baseball backstop, dugouts, and
  • batting cages

Health and Safety

  • Replace exterior and interior doors
  • Replace cafeteria windows
  • Replace fire alarm and carbon monoxide systems
  • Replace elevator

Infrastructure

  • Repair exterior walls
  • Replace courtyard door canopies and improve drainage
  • Replace air handling unit for music room
  • Replace electrical switchboard and panels
  • Renovate bathrooms at auditorium, gymnasium, and pool spectator area
  • Replace kitchen equipment and hood

Sitework

  • Improve pavement and sidewalks

POOL IMPROVEMENTS

  • Renovate pool locker rooms
  • Upgrade pool mechanical, electrical and plumbing system
  • Upgrade starting blocks and timing system

Planned Improvements - Middle School

Health and Safety

  • Replace exterior and interior doors
  • Replace select windows
  • Repair select flooring and walls
  • Replace elevator

Infrastructure

  • Repair exterior walls
  • Replace kitchen equipment and hood
  • Provide new kitchen cooler and freezer
  • Replace kitchen flooring
  • Upgrade kitchen mechanical, electrical and plumbing system

Sitework

  • Improve fencing, pavement, and sidewalks

Planned Improvements - Elementary Schools

TAFT ELEMENTARY SCHOOL
Health and Safety

  • Replace classroom heating systems
  • Abate and replace flooring in 13 classrooms
  • Repair concrete areaway wall
  • Replace exterior and interior doors

Infrastructure

  • Replace kitchen equipment and hood
  • Provide new kitchen cooler and freezer

LITTLE BRITAIN ELEMENTARY SCHOOL
Health and Safety

  • Replace exterior and interior doors
  • Replace septic system

Infrastructure

  • Replace roofing at entrance wing
  • Replace exhaust fans
  • Replace water heater and exhaust

ROUND HILL ELEMENTARY SCHOOL
Health and Safety

  • Replace exterior and interior doors

Infrastructure

  • Replace water heater and exhaust
  • Replace kitchen equipment

ALL ELEMENTARY SCHOOLS
Playgrounds

  • Upgrade playground equipment at all three elementary schools